11kV & 33kV Trenching & Cabling Works — Solar Farm, Senawang
Trenching and cabling works for 11kV and 33kV infrastructure at a solar farm in Senawang.
View ProjectIntegrated underground utility and HDD solutions — from route assessment and engineering through civil works, installation, testing and handover.
Our work is planned and carried out according to applicable industry safety standards and the requirements of relevant authorities and regulatory bodies. Each project begins with route assessment and utility detection, followed by controlled installation and staged inspection through to testing and handover.
Site survey, utility detection coordination and bore-path or route planning before any works commence.
HDD, trenching, duct installation, cable laying and civil works carried out with appropriate equipment and site controls.
Staged inspections, testing, documentation and as-built information prepared for client and authority acceptance.
We support energy, telecommunications, utilities and infrastructure projects with safe, efficient and carefully planned underground installation services.
Underground power cable infrastructure for voltage levels up to 275 kV.
Learn MoreHorizontal directional drilling for power and utility crossings
Learn MoreUnderground cable laying, HDPE ducting and associated infrastructure
Learn MoreOpen trenching, manholes, reinstatement and infrastructure works
Learn MoreInitial project scoping and requirements gathering.
Site survey, route planning and engineering design.
Regulatory approvals and project scheduling.
Equipment deployment and site preparation.
Construction and installation works.
Commissioning, testing and project handover.
Initial project scoping and requirements gathering.
Site survey, route planning and engineering design.
Regulatory approvals and project scheduling.
Equipment deployment and site preparation.
Construction and installation works.
Commissioning, testing and project handover.
Trenching and cabling works for 11kV and 33kV infrastructure at a solar farm in Senawang.
View ProjectHDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectUnderground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View ProjectModern HDD rigs, excavators and support equipment for accurate and controlled project execution.
Horizontal directional drilling for underground utility crossings
Controlled excavation and trenching for underground utility installation
Transport and deployment of HDD machinery and supporting equipment for project execution.
Our work is planned and carried out according to applicable industry safety standards and the requirements of relevant authorities and regulatory bodies. Pre-work site surveys, risk assessments, toolbox meetings and staged inspections are standard practice on every project.
Ready to discuss your project? Contact our team to discuss your requirements.