11kV & 33kV Trenching & Cabling Works — Solar Farm, Senawang

11kV & 33kV Trenching & Cabling Works — Solar Farm, Senawang

Power & Solar Infrastructure — Senawang, Malaysia

Project Overview

Trenching and cabling works for 11kV and 33kV infrastructure at a solar farm in Senawang.

Works were carried out according to applicable authority requirements and client standards.

Our Approach

1

Route Survey & Planning

Cable route survey, utility detection and route planning.

2

Trenching & Civil Works

Controlled trenching, duct installation and supporting civil works.

3

Cable Installation

Cable laying, pulling, jointing and termination for 11kV and 33kV infrastructure.

4

Testing & Handover

Testing, documentation and handover support.

Cover Image

Trenching and cabling works at a solar farm in Senawang

Trenching and cabling works at a solar farm in Senawang

Solar Farm, Senawang — Project Gallery

Workers handling cable and conduit on the hillside at the solar farm site in Senawang, with solar panel mounting structures visible in the background.

Cable handling works

Workers handling cable and conduit on the hillside at the solar farm site in Senawang, with solar panel mounting structures visible in the background.

Cable reels and trench excavation with CASE backhoe at the solar farm site.

Cable reels and trenching

Cable reels and trench excavation with CASE backhoe at the solar farm site.

Workers guiding multiple cables into an open trench on the hillside, with solar panel structures visible above.

Cable installation works

Workers guiding multiple cables into an open trench on the hillside, with solar panel structures visible above.

Workers managing cable bundles in a deep trench cut into the hillside at the solar farm.

Trenching works

Workers managing cable bundles in a deep trench cut into the hillside at the solar farm.

Hitachi excavator (TMB-E10) working alongside personnel at the cable trench, with solar panel structures and forested hillside in the background.

Excavation works

Hitachi excavator (TMB-E10) working alongside personnel at the cable trench, with solar panel structures and forested hillside in the background.

View All Projects →
Underground cable installation works in PerlisPower & Solar2026

11kV Underground Cable Installation — Perlis

Perlis, Malaysia

HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km

View Project
HDD rig and drilling works at the Bandar Penawar fibre infrastructure siteTelecommunications2025

Fibre Infrastructure — Bandar Penawar

Bandar Penawar, Johor, Malaysia

OSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.

View Project
HDD and underground civil works in MuarHDD & Civil2026

Underground Civil Works — Muar

Muar, Johor, Malaysia

Underground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor