11kV Underground Cable Installation — Perlis
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectTelecommunications — Bandar Penawar, Johor, Malaysia
OSP and ISP works for new-build fibre infrastructure in Bandar Penawar.
The documented project scope covered approximately 20.5 km, including HDD crossings, duct installation, fibre cable blowing, splicing, termination and OTDR testing.
Works were carried out according to applicable authority requirements and client standards.
Network route survey, utility detection and civil preparation.
HDD crossings, trenching and duct installation.
Fibre cable blowing, splicing and termination.
OTDR and power-meter testing, documentation and handover.
Cover Image
HDD rig and drilling works at the Bandar Penawar fibre infrastructure site
Compaction works
Compaction equipment at the Bandar Penawar fibre infrastructure site, Jalan Desaru – Tanjung Balau.
HDD rig operations
HDD rig operating at the Bandar Penawar site, Jalan Tg Balau – Sedili Kecil.
Bore-path works
HDD drill rod and bore-path in trench at Bandar Penawar, MH112–MH Ext.
Chamber installation
Workers installing chamber at Jalan Desaru – Tanjung Balau, Bandar Penawar.
Unverified — Photo 05
HDD rig pulling pipe through a palm-oil plantation at Jalan Bukit Aping – Kangkar Papan, Kota Tinggi, Johor (15 August 2025).
Unverified — Photo 06
HDD drill rod emerging from ground in a forested area; no confirmed town in metadata.
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectUnderground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View Project