11kV Underground Cable Installation — Perlis
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectHDD & Civil Infrastructure — Muar, Johor, Malaysia
Underground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor, supporting telecommunications-infrastructure development.
Works included HDD crossings, duct installation, civil works and reinstatement along the project corridor.
Works were carried out according to applicable authority requirements and client standards.
Site survey, utility detection and route preparation.
Horizontal directional drilling for underground utility crossings.
Duct installation, civil works and supporting infrastructure.
Backfilling, compaction and surface reinstatement.
Cover Image
Excavation works along the Muar underground civil corridor
HDD rig operations
Red HDD rig with drill rod advancing through trench in palm oil plantation, one worker in hi-vis walking away from camera. MH 8–9, Index 201 (13 February 2026).
Trench excavation
Aerial view of a deep straight trench cut through dry laterite soil alongside a highway, black corrugated duct visible at base of trench. No personnel visible. MH 20–19, Index 5470, Bukit Bakri, Johor (13 March 2026).
HDD drilling works
Deep narrow trench with HDD drill rod advancing, CASE excavator visible above trench. Palm oil plantation backdrop. MH 51–52 (9 June 2026).
Excavation works
CASE excavator digging trench in palm oil plantation, black corrugated duct visible in trench. Jln Muar, Bukit Bakri, Johor (8 June 2026).
Pipe pulling works
Red HDD rig pulling dark pipe through trench, worker in hi-vis and yellow boots standing beside rig with back to camera. Drill rods staged on lorry behind. MH 4–5, Index 205 (24 February 2026).
Chamber installation
Two workers in hi-vis and hard hats guiding a precast concrete chamber being lifted by CASE excavator with green slings. Palm oil plantation backdrop. Jalan Muar–Yong Peng, 84200 Muar, Johor (26 May 2026).
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectOSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.