11kV Underground Cable Installation — Perlis
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectPower Infrastructure — Pulau Pinang, Malaysia
HDD works supporting the installation, testing and commissioning of 33kV aluminium XLPE underground cables and accessories at Jalan Song Ban Kheng, Pulau Pinang.
Works included HDD crossings, duct installation and supporting civil works for the underground cable route.
Works were carried out according to applicable authority requirements and client standards.
Cable route survey, utility detection and bore-path planning.
HDD crossings and duct installation for the underground cable route.
Supporting civil works and reinstatement.
Testing, documentation and handover support.
Cover Image
Roadside cable and trench works at Taman Kota Permai, Bukit Mertajam, Pulau Pinang
Trench and conduit works
Workers alongside an open trench with conduit pipe at Lorong Kota Permai, Taman Kota Permai, Bukit Mertajam, Pulau Pinang (October 2022).
Road surface cutting
Road surface cutting with a walk-behind saw at Jalan Kota Permai, Taman Kota Permai, Bukit Mertajam, Pulau Pinang (October 2022).
HDD tooling connection
Worker connecting HDD drill tooling at Lebuh Kota Permai 1, Taman Kota Permai, Bukit Mertajam, Pulau Pinang (October 2022).
Pipe joining works
Butt-fusion pipe joining equipment with red HDPE ducts at Jalan Kota Permai, Bukit Mertajam, Pulau Pinang (October 2022).
HDD and cabling works for 11kV aluminium XLPE underground cables, approximately 3 km
View ProjectOSP and ISP works for new-build fibre infrastructure, covering approximately 20.5 km.
View ProjectUnderground civil and HDD works along the Jalan Kampung Sri Manis to Jalan Pintasan Muar corridor
View Project